CASE STUDY 04 · ALBERTA · OIL SANDS
CP field testing for a firewater pipeline
Two days of cathodic protection field testing on an existing buried firewater pipeline at an oil sands plant, to give a replacement pilot a defensible current requirement for its CP design.
Oil sands operator · via construction contractor
- Cathodic Protection
- Field testing
- Design basis
The problem
A firewater pipeline replacement program at an oil sands plant was starting with a pilot section. Before designing cathodic protection for the existing buried piping, the team needed to know how the pipe polarizes, what it is electrically connected to, and how corrosive the soil is, with a method that could be repeated on later sections. The target was the 100 mV polarization criterion.
What we did
- 01Ready before arrivalEquipment calibration records and AMPP certifications went to the contractor before mobilization, with site onboarding and safety documents.
- 02Current step and E-log(i)A temporary rectifier was connected to a valve at one keyhole excavation, and current was stepped up to the source maximum to measure potential against applied current.
- 03Check what is connectedCommon cell potential tests on seven structures showed one hydrant, the valve building, the culvert and the test station leads isolated from the piping, and two valves and another hydrant likely continuous or partially continuous.
- 04Measure the soilCongestion ruled out an in-situ pin array, so samples from three locations were tested in a soil box. They read 230 to 275 Ω·m, consistent with sandy, dry soil and relatively low uniform corrosion risk. The memo also notes that a 2022 four-pin test in the area read lower.
- 05State the limitsBecause of the amount of bare metal, polarization was not expected to reach steady state, so extrapolating to a 100 mV current requirement is conservative, and assumes no mixed-metal cells. The memo notes that further current injection testing to adjacent structures would be required once access allows.
Have a similar asset?
Tell us about the main, line or structure. An engineer reads every request, and anything that needs a stamp goes to one of our Professional Engineers.