Municipal water and wastewater · British Columbia · 2026
Impressed current anode bed installed, rectifier relocated and every test point proven in two field days.
Power and transmission · Central Alberta · 2025
Induced voltage modelled on 14 km of pipeline beside a 240 kV line, then brought under the 15 V touch limit.
Transit · Edmonton region, AB · 2025
72 hours of synchronized logging found two interference sources and set the order of mitigation.
Pipelines · Northeast BC · 2024
CIS and DCVG over 38 km, risk-ranked into six digs. Five coating defects confirmed; no wall loss beyond 10%.
Municipal water and wastewater · Southern Alberta · 2024
Magnesium anodes added at 22 locations without taking the feeder main out of service.