CASE STUDY 09 · ALBERTA · UPSTREAM PIPELINES

Coating conductance test on an HDD river crossing

One field day, right after pullback, to prove the coating on a new horizontally drilled river crossing came through intact before the line went into service.

Upstream oil and gas producer

  • Pipeline integrity
  • Coating conductance
  • Trenchless crossing
Excellent
Coating quality, AMPP TM-102 (PASS)
60 μS/m²
Normalized coating conductance
0.004%
Estimated bare area
1 day
Field testing

The problem

An operator was putting a new 219.1 mm FBE-coated pipeline segment under a river by horizontal directional drill. Pullback can scrape or gouge coating where nobody can see it, so the operator needed independent proof, before service, that the coating on the buried crossing was intact.

Profile of a horizontally drilled river crossing: a 219.1 mm FBE-coated pipe tested at both ends right after pullback with an impedance sweep from 41 to 513 Hz; coating rated Excellent under AMPP TM-102, 60 μS/m², estimated bare area 0.004 %.

What we did

  1. 01
    Plan around the pullback
    The test was scoped and crewed around the pullback date the operator's facilities engineer set.
  2. 02
    Look first
    The exposed exit side of the FBE coating was inspected for visible damage.
  3. 03
    Sweep the frequencies
    An impedance sweep from 41 Hz to 513 Hz at both ends of the crossing gave the coating's resistance and capacitance.
  4. 04
    Apply current
    Static potentials were measured at both ends, then ON and instant-OFF potentials with a temporary DC source and manual interruption. Soil resistivity was measured beside the exit.
  5. 05
    Rate and report
    Normalized coating conductance was calculated and rated to AMPP TM-102, with the estimated bare area, in a signed letter report and data sheet.

Have a similar asset?

Tell us about the main, line or structure. An engineer reads every request, and anything that needs a stamp goes to one of our Professional Engineers.

Have an asset that needs protecting?
Request a quote
AMPP CP Level 4ISNetworldAvettaComplyWorks