Coating quality, AMPP TM-102 (PASS)
60 μS/m²
Normalized coating conductance
0.004%
Estimated bare area
1 day
Field testing
The problem
An operator was putting a new 219.1 mm FBE-coated pipeline segment under a river by horizontal directional drill. Pullback can scrape or gouge coating where nobody can see it, so the operator needed independent proof, before service, that the coating on the buried crossing was intact.
What we did
- 01Plan around the pullbackThe test was scoped and crewed around the pullback date the operator's facilities engineer set.
- 02Look firstThe exposed exit side of the FBE coating was inspected for visible damage.
- 03Sweep the frequenciesAn impedance sweep from 41 Hz to 513 Hz at both ends of the crossing gave the coating's resistance and capacitance.
- 04Apply currentStatic potentials were measured at both ends, then ON and instant-OFF potentials with a temporary DC source and manual interruption. Soil resistivity was measured beside the exit.
- 05Rate and reportNormalized coating conductance was calculated and rated to AMPP TM-102, with the estimated bare area, in a signed letter report and data sheet.