CASE STUDY 02 · ALBERTA · POWER GENERATION
Annual CP survey at two power generation facilities
Annual cathodic protection surveys of the buried natural gas assets at two power generation facilities: three reports, three field days, and a clear answer on what is protected and what is not.
Power generation operator
- Cathodic Protection
- Annual survey
- Facility piping
The problem
A power generation operator needed its annual cathodic protection surveys on the buried natural gas assets at two facilities: a 16 in. natural gas supply pipeline and the plant gas lines at the first, and the station piping and process equipment at the second. Both sites are protected by sacrificial anodes, and the owner needed results it could act on.
What we did
- 01Build on last year's testingTesting the year before had shown which anode connections had to be broken to read true 'OFF' potentials. This survey started from that knowledge.
- 02Make the survey interruptibleRedundant sacrificial anode connections were disconnected at all but one test station, so a single interruption point now allows an interrupted survey of the connected lines and the gas risers.
- 03Explain the high OFF potentialsThe supply pipeline read high 'OFF' potentials and its isolation kit measured only 30% effective. Bolt-by-bolt testing showed the kit was isolating; a decoupler across it was storing charge and feeding current back during interrupt cycles. The off period needs to be extended to confirm this, and another CP source may also explain the readings.
- 04Use the 100 mV criterion where −850 mV was not metThe gas risers on the heater pad did not meet −850 mV. Their anodes were disconnected for about two weeks, and every riser depolarized by more than 100 mV, which shows they are protected.
- 05Report what is not workingAt the second facility, most structures did not meet criteria or could not be properly evaluated, consistent with several years of historical data. The site is largely continuous, so isolation kits are bypassed. The report recommends a soil resistivity test and an impressed current CP design for the site, and a sacrificial anode system for the wastewater pump.
Have a similar asset?
Tell us about the main, line or structure. An engineer reads every request, and anything that needs a stamp goes to one of our Professional Engineers.