Annual CP survey at two power generation facilities

Annual cathodic protection surveys of the buried natural gas assets at two power generation facilities: three reports, three field days, and a clear answer on what is protected and what is not.

Power generation operator

  • Cathodic Protection
  • Annual survey
  • Facility piping
3
Survey reports issued
3
Field days
> 100 mV
Depolarization on every heater-pad riser
0
Deficiencies at the first facility

The problem

A power generation operator needed its annual cathodic protection surveys on the buried natural gas assets at two facilities: a 16 in. natural gas supply pipeline and the plant gas lines at the first, and the station piping and process equipment at the second. Both sites are protected by sacrificial anodes, and the owner needed results it could act on.

Gas supply pipeline into a power generation facility: the isolation kit tested bolt by bolt and isolating, a decoupler across it storing charge, and the heater-pad risers depolarized 209 to 471 mV against the 100 mV criterion.

What we did

  1. 01
    Build on last year's testing
    Testing the year before had shown which anode connections had to be broken to read true 'OFF' potentials. This survey started from that knowledge.
  2. 02
    Make the survey interruptible
    Redundant sacrificial anode connections were disconnected at all but one test station, so a single interruption point now allows an interrupted survey of the connected lines and the gas risers.
  3. 03
    Explain the high OFF potentials
    The supply pipeline read high 'OFF' potentials and its isolation kit measured only 30% effective. Bolt-by-bolt testing showed the kit was isolating; a decoupler across it was storing charge and feeding current back during interrupt cycles. The off period needs to be extended to confirm this, and another CP source may also explain the readings.
  4. 04
    Use the 100 mV criterion where −850 mV was not met
    The gas risers on the heater pad did not meet −850 mV. Their anodes were disconnected for about two weeks, and every riser depolarized by more than 100 mV, which shows they are protected.
  5. 05
    Report what is not working
    At the second facility, most structures did not meet criteria or could not be properly evaluated, consistent with several years of historical data. The site is largely continuous, so isolation kits are bypassed. The report recommends a soil resistivity test and an impressed current CP design for the site, and a sacrificial anode system for the wastewater pump.

Have a similar asset?

Tell us about the main, line or structure. An engineer reads every request, and anything that needs a stamp goes to one of our Professional Engineers.

Have an asset that needs protecting?
Request a quote