Corrosion and CP assessment of about 350 transmission towers
Corrosion engineering for a ground-line assessment of every lattice tower on a 115 kV line: where the steel is losing section, why the existing cathodic protection is uneven, and how many anodes it takes to fix it.
Utility structures contractor · for an electric transmission owner
- Cathodic Protection
- Transmission structures
- Condition assessment
The problem
The ground-line steel and foundations of a 115 kV lattice-tower line needed a condition assessment for corrosion, mechanical damage and footing condition. Earlier cathodic protection had been applied unevenly: on many towers, anodes sat on only one or two legs, so legs on the same tower received different protection. The assessment contractor brought ACiD in as the corrosion and CP engineer.
What we did
- 01Engineer on the team, inspectors in the fieldACiD acted as the AMPP-certified corrosion engineer for the assessment team, with a CP technician (CP2) and a coating inspector (CIP2) on site observing and checking the testing.
- 02QA/QC on every structureCorrosion-related testing and data collection were observed and checked across every tower on the line, July to October 2025.
- 03Read the soil and the CPSoil resistivity and pH were reviewed for below-grade corrosion potential. The existing CP was checked leg by leg: visual defects such as broken leads, 'on' and 'off' potentials, and the potential and current of individual galvanic anodes.
- 04Coatings and groundingBelow-grade and atmospheric coatings (the original hot-dip galvanizing) and the counterpoise grounding were assessed.
- 05Seal the corrosion findingsACiD sealed the corrosion and CP findings and recommendations to AMPP SP0315. Structural repairs were certified by a separate engineering firm.
Have a similar asset?
Tell us about the main, line or structure. An engineer reads every request, and anything that needs a stamp goes to one of our Professional Engineers.