14 kmCorridor modelled
< 15 VTouch voltage after mitigation
6Decouplers installed
0Lost-time incidents
The problem
A 14 km pipeline runs beside a 240 kV transmission line.
Field readings showed induced AC above the safe touch limit at two valve sites, and the operator needed a plan before a scheduled dig.
Our approach
-
01
Model
Induced voltage modelled for normal and fault conditions along the corridor.
-
02
Design
Zinc ribbon and six DC decouplers specified at the worst-case locations.
-
03
Install
Ribbon laid in the existing trench; decouplers set at the valve sites.
-
04
Verify
Touch and step voltages re-measured under load.