CASE STUDY

AC mitigation in a shared power corridor

Induced voltage modelled on 14 km of pipeline beside a 240 kV line, then brought under the 15 V touch limit.

Sector
Power and transmission
Location
Central Alberta
Year
2025
Transmission line
Shared corridor (placeholder image)
14 kmCorridor modelled
< 15 VTouch voltage after mitigation
6Decouplers installed
0Lost-time incidents

The problem

A 14 km pipeline runs beside a 240 kV transmission line.

Field readings showed induced AC above the safe touch limit at two valve sites, and the operator needed a plan before a scheduled dig.

Our approach

  1. 01

    Model

    Induced voltage modelled for normal and fault conditions along the corridor.

  2. 02

    Design

    Zinc ribbon and six DC decouplers specified at the worst-case locations.

  3. 03

    Install

    Ribbon laid in the existing trench; decouplers set at the valve sites.

  4. 04

    Verify

    Touch and step voltages re-measured under load.