EXAMPLE · ILLUSTRATIVE, NOT A REAL ACiD PROJECT

CASE STUDY

Stray current survey across nine LRT crossings

72 hours of synchronized logging found two interference sources and set the order of mitigation.

Sector
Transit
Location
Edmonton region, AB
Year
2025
Light rail line
LRT corridor (placeholder image)
72 hSynchronized logging
9Crossings tested
2Sources identified
1Ranked mitigation plan

The problem

Pipe-to-soil readings near an LRT line swung with train traffic.

The owner needed to know which crossings were affected, by how much, and what to fix first.

Our approach

  1. 01

    Plan

    Nine crossings and a reference site chosen with the owner.

  2. 02

    Log

    72 hours of synchronized logging across all sites.

  3. 03

    Analyse

    Interference correlated with traction current; two sources isolated.

  4. 04

    Recommend

    A ranked mitigation plan with costs for each step.