The problem
Pipe-to-soil readings near an LRT line swung with train traffic.
The owner needed to know which crossings were affected, by how much, and what to fix first.
Our approach
-
01
Plan
Nine crossings and a reference site chosen with the owner.
-
02
Log
72 hours of synchronized logging across all sites.
-
03
Analyse
Interference correlated with traction current; two sources isolated.
-
04
Recommend
A ranked mitigation plan with costs for each step.