ECDA on 38 km of gathering pipeline

CIS and DCVG over 38 km, risk-ranked into six digs. Five coating defects confirmed; no wall loss beyond 10%.

Sector
Pipelines
Location
Northeast BC
Year
2024
Pipeline valve
Gathering line valve (placeholder image)
38 kmCIS and DCVG surveyed
6Digs, risk ranked
5Coating defects confirmed
< 10%Maximum wall loss

The problem

A gathering system was due for an external corrosion direct assessment.

The operator wanted the fewest digs that would still meet the regulator’s expectations.

Our approach

  1. 01

    Pre-assess

    Records, soils and CP history reviewed; regions defined.

  2. 02

    Survey

    Close-interval and DCVG surveys over 38 km.

  3. 03

    Rank

    Indications risk-ranked into six digs.

  4. 04

    Verify

    Digs confirmed five coating defects; wall loss under 10% at all six.