22Anode locations
25 yrDesign life
0 hService outage
22 of 22Stations meeting criteria
The problem
A ductile iron feeder main had no cathodic protection and two recent breaks.
It could not be taken out of service for more than a few hours at a time.
Our approach
-
01
Survey
Soil resistivity and pipe-to-soil readings along the alignment.
-
02
Design
22 anode locations sized for a 25-year life.
-
03
Install
Keyhole excavations, anodes and test stations installed under live flow.
-
04
Commission
Readings taken at every test station after 30 days.