EXAMPLE · ILLUSTRATIVE, NOT A REAL ACiD PROJECT

CASE STUDY

Galvanic retrofit on a reservoir feeder main

Magnesium anodes added at 22 locations without taking the feeder main out of service.

Sector
Municipal water and wastewater
Location
Southern Alberta
Year
2024
Water infrastructure
Feeder main (placeholder image)
22Anode locations
25 yrDesign life
0 hService outage
22 of 22Stations meeting criteria

The problem

A ductile iron feeder main had no cathodic protection and two recent breaks.

It could not be taken out of service for more than a few hours at a time.

Our approach

  1. 01

    Survey

    Soil resistivity and pipe-to-soil readings along the alignment.

  2. 02

    Design

    22 anode locations sized for a 25-year life.

  3. 03

    Install

    Keyhole excavations, anodes and test stations installed under live flow.

  4. 04

    Commission

    Readings taken at every test station after 30 days.